yazilimweb tasarim

Process of going solar with Solar Shade Engineering Pvt Ltd

GET STARTED

  • We prequalify your home’s readiness for solar

DESIGN + PERMITTING

  • Site evaluation
  • Professional design + engineering
  • Permit application
  • Rebate + incentive paperwork
  • Financial documents review

INSTALLATION + INSPECTION

  • System is installed
  • Building inspection
  • Utility company review

TURN YOUR SYSTEM ON !

  • Net meter is installed(if applicable)
  • Flip the switch and watch that meter run backword